GM Futurliner Progress Photos
GM Futurliner Restoration Project
National Automotive and Truck Museum of the United States

HOME
Status

Schedule
Photos:
  2006
  2005
  2004
  2003
 
2002
N2001
 
2000
  1999

Wally fabricated at home two electrical junction boards to terminate wiring at the bottom of the instrument panel. He then installed these boards as well as started the process to connect wiring to these panels. Stan (light blue) is assisting Wally (dark blue).

Wires are run from the junction boards to the instrument panel.

The front access doors were removed so that the wiring could be completed without being cramped.

Don Mayton solders wires together at the rear of the Futurliner for 15 of the lower running lights.

The men are beginning the process of of installing weather seals on all of the doors.

Contacts:

Don M. Mayton, Project Director
4521 Majestic Vue, Zeeland, MI 49464
616 875-3058

Dean G. Tryon, Newsletter Editor
2516 Laurelford Ln., Wake Forest, NC 27587
919 562-4660