This is the rear section of the Futurliner where the inside walls
are being resurfaced. This is where the generator and
electrical box goes. The little room is about 8' wide by 6'). At the
end of the work day they had this area in primer. They also primed
an area in the front left inside of the engine compartment that had
never been primed.
This is a good picture of the partially open 16' display doors.
Rubber molding is placed around the engine compartment access door.
Mike Ball keeping records straight and Dick Saddler deep in thought.
Jim Baker does some layout work.