Paul and Howard drill holes for the re-enforcing bar for the 16'
doors. They weld them in place and grind them down. Hopefully, this
corrects the 3" sag in the doors.
Stan cuts and installs insulation for the engine compartment.
Connie DeJong (left) was able to get the many interior light
fixtures & frames sand blasted. Here he primes and sands them down.
Art is working on the frames for the lighting fixtures.
This is a picture of the swing out front panel with the headlights
and the new wiring.