Jerry Sigler and Art
Meidema start work on a new plywood floor for the lower side doors
while Al Scholten while Fred Carpenter finish wiring up the ceiling
lights.
When the lower side doors are lowered they become a floor. The
inside of these doors will be covered with 3/4" plywood and
then linoleum. The 3/4" plywood sheets were cut and then
painted to protect them from moisture.
The dash labeling is
complete.
Another picture of the dash labeling.
As you can see from these pictures, the cockpit wiring is a
complicated and tedious task
Ed DeVries grinds on piano hinge for removal.
The ceiling is finished.
Wayne Jackson made a handy board for storing larger tools.