The men are working on the left front of the Futurliner,
inspecting and working on the large doors. You can begin to see the
framework for the lower doors.
Welding is the name of the game on the Futurliner project. To the right in the
picture is more framework being welded together.
Steel pieces for the framework are being laid into approximate
positing for welding in place.
Don Mayton inspects the steel framing for an interior section
Don Mayton is running a bolt through a hole while someone checks for
alignment on the other side.
Contacts:
Don M.
Mayton, Project Director
4521 Majestic Vue, Zeeland, MI 49464
616 875-3058
Dean G.
Tryon, Newsletter Editor
2516 Laurelford Ln., Wake Forest, NC 27587
919 562-4660