This photo shows the roof section and lower door frame in place.
Don and Connie make final adjustments and welds to secure the roof
section firmly into place.
This is a good view of the new roof section in place. It is much
more sturdy than the original design and will not sag when the
large 16' doors are opened.
Don took this picture of Stan Bowers and Del Carpenter working in
the storage compartments. Stan and Del did not work there too
long. Hot sparks from men welding above them kept them hopping but the
thing that really flushed them out was the cold water splashing in
their faces as the men above tried to put out a small fire with a
bucket of water.